Hot Rolled Steel Furnace Project
Demolition of two walking beam furnaces (280t/h) and construction of two new, high capacity (400t/h) furnaces. Furnaces was delivered to the client 40 days ahead of schedule
Demolition of two walking beam furnaces (280t/h) and construction of two new, high capacity (400t/h) furnaces. Furnaces was delivered to the client 40 days ahead of schedule